File #: 21-084    Version: 1
Type: Resolution Status: Passed
File created: 5/26/2021 In control: Board of Commissioners
On agenda: 6/22/2021 Final action: 6/22/2021
Title: ENO Maintenance Building - Exterior Envelope Repair
Attachments: 1. Bid Form & Liability Cert, 2. Scope of Work, 3. BASE BID - CDM Smith, 4. ENO Maint Roof _Board Resolution Revised 6.9.pdf, 5. ENO Maintenance Building - Exterior Envelop Repair.pdf
title
ENO Maintenance Building - Exterior Envelope Repair
end
DESCRIPTION: The roof structure is to have a waterproof coating applied and all penetrations (roof boots) replaced
AGENDA NO: Click or tap here to enter text.

ACTION REQUEST:
? Approval ? Review Comment ? Information Only ? Other

RECOMMENDATION:
recommendation
To authorize the Chief Executive Officer to award a contract to C.D.W. Services LLC for the Scope of Work designated as Base Bid and Alternative 1 on the Louisiana Bid Form for the total amount $580,000.
end
ISSUE/BACKGROUND:
body
Due to limited funding, the ENO Maintenance Building Exterior Repair was eliminated during the bid process in 2018 and only the repair to the Administration Building was offered for public bid. The 68,000 square feet of roof area for the maintenance building has many sources for water intrusion. The metal roof does not require replacement but requires that a coating is applied. Roof flashing will be replaced which is approximately 870 linear feet. The penetrations of the roof will receive new boots. Parapet cap is to be replaced. Lightning protection to be repaired and installed. Two vertical ladders for roof access are to be repaired.

end
DISCUSSION:
An engineering package which details the scope of work has been completed by CDM Smith Architects Inc. These drawings and specifications were the documents provided to potential bidders by way of the RTA ProcureWare System. The funding available will be sufficient for items designated as base bid that includes roof coating, system flashing, expansion joints, center high bay and roof accessories. Additionally, the scope will include the alternate 1, that includes sheet metal parapet cap replacement and lighting protection per the Engineering Package.
FINANCIAL IMPACT:
The construction funding is being made available by the following sources:
LA040045.1050.117111, LA 2016-019.1132.114402B and LA 2019-016.1132.117208.
Total from all three sources is $747...