File #: 24-132    Version: 1
Type: Resolution Status: Agenda Ready
File created: 12/4/2024 In control: Board of Commissioners
On agenda: 12/17/2024 Final action:
Title: Ratification: Riverfront Substation Track Bond Emergency Repair
Attachments: 1. Quote_24-1018_Reinstall_rail_bonds, 2. Procurment Routing Track Bonds, 3. PO_RTAP_01021_0, 4. Riverfront Substation Track bond Emergency Repair
title
Ratification: Riverfront Substation Track Bond Emergency Repair
end
DESCRIPTION: A ratification for an emergency procurement for the riverfront substation ground track bound.
AGENDA NO: Click or tap here to enter text.

ACTION REQUEST:
? Approval ? Review Comment ? Information Only ? Other

RECOMMENDATION:
recommendation
To ratify the emergency procurement authorized by the Chief Executive Officer for the repair of the riverfront substation grounding track bonds. Barnes Electric was selected as the vendor for this repair due to their extensive knowledge of the substation and their similar work. The cost for repairs is not to exceed $148,400.00.
end
ISSUE/BACKGROUND:
body
The Riverfront substation supplies power to our Riverfront, Rampart, UPT, and the lower half of the Canal Streetcar line.
While inspecting the substation and a section of track, it was discovered that the grounding bonds that tie the substation to the track had been cut and stolen. All together 7 grounding bonds were cut. Staff notified transit police, and a report was made. Agency staff also notified our insurance carrier to make a claim.
end
DISCUSSION:
The grounding cables at the riverfront substation were cut and stolen, creating a significant issue for the return flow of electricity back to the substation and potentially causing an excessive load on the remaining ground. Although power has been temporarily redistributed to maintain service, the situation at the riverfront substation remains critical.
Due to the significance of the substation and potential safety concerns, the Chief Executive Officer authorized an emergency procurement for the repair of the track bonds, with work set to start on December 16, 2024. The agency will also attempt to deter copper theft in this location by incasing the bonds in concrete. This will necessitate a shutdown of the riverfront substation and the line. Given Barnes Electricals' familiarity with our systems from previous RTA work,...