Legislation Details

File #: 26-040    Version: 1
Type: Resolution Status: Agenda Ready
File created: 3/23/2026 In control: Board of Commissioners
On agenda: 4/28/2026 Final action:
Title: Carrollton Double Crossover Widening-Contract Award (IFB2026-004)
Attachments: 1. Carrollton Double Crossover Widening-Contract Award, 2. 2 - Procurement Summary - IFB 2026-004, 3. 3 - 251209_Carrollton_ICE, 4. 4 - Admin Review Form IFB 2026-004, 5. 5 - IFB 2026-004 Carrolton Double Crossing, 6. 6 - Pointer Smith Contracting Corp
Related files: 25-042, 21-172
title
Carrollton Double Crossover Widening-Contract Award (IFB2026-004)
end
DESCRIPTION: : Requesting Board authorization to award a construction contract for the Carrollton Double Crossover Widening project to Pointer Smith Contracting Corporation
AGENDA NO: Click or tap here to enter text.

ACTION REQUEST:
? Approval ? Review Comment ? Information Only ? Other

RECOMMENDATION:
recommendation
Authorize the Chief Executive Officer to execute a contract with Pointer Smith Contracting Corporation in an amount not to exceed $3,038,738 as the lowest responsive and responsible bidder for the Carrollton Double Crossover Widening project (IFB 2026-004).
end
ISSUE/BACKGROUND:
body
The Carrollton Double Crossover is a critical component of the St. Charles Avenue Streetcar that allows for operational flexibility and provides rider comfort at the terminus of the line. Improvements to this infrastructure are necessary to enhance accessibility in conformance with the Americans with Disabilities Act (ADA). The current geometry of the terminus is inadequate for wheelchair lifts to be deployed while two streetcars are at the Claiborne Avenue terminus of the line. Once the Double Crossover improvements are implemented, wheelchair lifts will be able to be deployed, and the stop will be considered an ADA accessible stop.
This project includes widening of the tracks and platform as well as associated track and OCS improvements to extend the useful life of the rail infrastructure at the Claiborne Avenue terminus of the line.
The project is aligned with the Agency's Strategic Mobility Plan, Major Action Area 11-Complete ADA Accessibility upgrades throughout the system.
end
DISCUSSION:
The project was publicly advertised through an Invitation for Bids (IFB 2026-004) in accordance with RTA procurement policies and federal requirements. The design process, led by Infinity Engineering Consultants, was completed in 2025. The bid documents were issued on January 22, 2026, ...

Click here for full text