File #: 23-166    Version: 1
Type: Resolution Status: Withdrawn
File created: 10/9/2023 In control: Finance Committee
On agenda: 1/11/2024 Final action:
Title: Algiers Ferry Barges Replacement Project (Refer to File ID #23-219)
Attachments: 1. Infinity Engineering Algiers Ferry Barges Proposal, 2. RTP 2023-03 Algiers Barges Replacement_23.04.08, 3. Barge Replacement_Board Resolution
Related files: 23-165, 23-219
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
title
Algiers Ferry Barges Replacement Project (Refer to File ID #23-219)
end
DESCRIPTION: Requesting Board authorization to award a task order for design work to Infinity Engineering and negotiate fee.
AGENDA NO: Click or tap here to enter text.


ACTION REQUEST:
? Approval ? Review Comment ? Information Only ? Other

RECOMMENDATION:
recommendation
Authorize the Chief Executive Officer to approve a Notice to Proceed with Infinity Engineering, a Certified DBE/SLDBE contracted as part of the on-call Architecture and Engineering pool, to complete preliminary and final design for ferry barges at the Algiers Point and Lower Algiers Ferry Terminals for an amount to be negotiated with the selected firm.
end
ISSUE/BACKGROUND:
body
The landing barges at the Algiers Point Ferry Terminal and the Lower Algiers Terminal are both at the end of their useful life. Each of these facilities provides a unique and distinct purpose to the agency's ferry system, which provides essential connections to the region's residents. In 2022, RTA received two grant awards from the Federal Transit Administration (FTA) Passenger Ferry Grant Program to replace each of these barges to ensure reliable service for these ferry routes. The RTA's intent is for the final design of the new barges to be a "universal barge concept" capable of serving multiple locations. The Barges Replacement Project - Design Phase will complete the design component of the barge replacement project. This is aligned with the Agency's Strategic Mobility Plan-World-Class Rider Experience goal.
end
DISCUSSION:
The Barges Replacement Project will deliver the following:
* Design of new barges to replace existing barges at Algiers Point and Lower Algiers Terminals. This includes preliminary design documentation, specifications and cost estimates at 30%, 60% and 90% design for RTA's review and approval, as well as final design documentation, including specifications and cost estimates.
* Construction Support ...