FY 2022 All Stations Accessibility Program Grant Application

end

DESCRIPTION: Application for grant funding for the planning of accessible stations on eligible legacy rail corridors.

AGENDA NO: 22-139

ACTION REQUEST: Approval     Review Comment  Information Only    Other

 

RECOMMENDATION:

recommendation

Authorize the Chief Executive Officer to seek federal funds not to exceed the amount of $200,000 to study, plan, and develop conceptual, standard designs of accessible stations along eligible legacy rail corridors. The total project amount is estimated at $250,000; the local match is 20% or $50,0000.

end

ISSUE/BACKGROUND:

body

RTA operates four streetcar lines. Since 1835, the St Charles streetcar is the oldest continuously operated urban railway in the United States. While there have been several improvements and changes to the line over the decades, the vehicles are generally of the original 1920’s vintage, and the stops and routes have not changed since 1973. In 2020, in accordance with a 2017 consent decree, 4 heritage-style streetcars with wheelchair-accessible lifts were repainted to match the vintage St Charles cars and 6 of the 54 total stops along the route were adapted to be compliant with the 1990 American with Disabilities Act (ADA). These 54 stops are spread out over a total route of 6.5 miles from Downtown to Uptown, with an average spacing of 645 ft per stop - or about 2 blocks.

end

DISCUSSION:

RTA is looking to develop a fully accessible system, regardless of service type and history. The staff proposes to take the first step of a planning study as part of the FTA’s All Stations Accessibility Program to develop a program of improvements to have all stops and immediately connecting infrastructure fully accessible for the thousands of residents and visitors that use this vital and scenic service. This study will include developing stop typologies that meet both accessibility needs, beyond ADA, and fit the iconic historic context. The study will also evaluate possible stop consolidation, to improve travel speed and reduce total program costs.

FINANCIAL IMPACT:

The RTA will be responsible for the local match of $50,000.

NEXT STEPS:

With Board approval, staff will submit a grant application to the FTA. If awarded, staff will return to Board to approve the procurement of a consultant to perform the work.

ATTACHMENTS:

1.                     Resolution

 

 

Prepared By:                                          Dwight Norton

Title:                                                               Sr. Director of Strategic & Long-Range Planning

                     

                                          

Reviewed By:                     Lona Hankins

Title:                                                               Deputy CEO, Planning & Infrastructure

 

Reviewed By:                     Gizelle Johnson-Banks

Title:                                                               Chief Financial Officer

 

 

 

 

 

                                                               9/13/2022

Alex Wiggins                                                                                                                              Date

Chief Executive Officer